AddFlow  AmCharts JavaScript Stock Chart AmCharts 4: Charts Aspose.Total for Java Altova SchemaAgent Altova DatabaseSpy Altova MobileTogether Altova UModel  Altova MapForce Altova StyleVision Server Altova MapForce Server Altova Authentic Aspose.Total for .NET Altova RaptorXML Server ComponentOne Ultimate Chart FX for SharePoint Chart FX CodeCharge Studio ComponentOne Enterprise combit Report Server Combit List & Label 22 Controls for Visual C++ MFC Chart Pro for Visual C ++ MFC DbVisualizer version 12.1 DemoCharge DXperience Subscription .NET DevExpress Universal Subscription Essential Studio for ASP.NET MVC FusionCharts Suite XT FusionCharts for Flex  FusionExport V2.0 GrapeCity TX Text Control .NET for WPF GrapeCity Spread Studio Highcharts Gantt Highcharts 10.0 版 HelpNDoc Infragistics Ultimate  ImageKit9 ActiveX ImageKit.NET JetBrains--Fleet JetBrains-DataSpell JetBrains--DataGrip jQuery EasyUI jChart FX Plus Nevron Vision for .NET OPC DA .NET Server Toolkit  OSS ASN.1/C Oxygen XML Author  OSS 4G NAS/C, C++ Encoder Decoder Library OSS ASN.1 Tools for C with 4G S1/X2 OSS ASN.1/C# OSS ASN.1/JAVA OSS ASN.1/C++ OPC HDA .NET Server Toolkit OPC DA .Net Client Development Component PowerBuilder redgate NET Developer Bundle Report Control for Visual C++ MFC  Altova StyleVision Sencha Test Stimulsoft Reports.PHP Stimulsoft Reports.JS Stimulsoft Reports.Java Stimulsoft Reports. Ultimate Stimulsoft Reports.Wpf Stimulsoft Reports.Silverlight SPC Control Chart Tools for .Net SlickEdit Source Insight Software Verify .Net Coverage Validator Toolkit Pro for VisualC++MFC TeeChart .NET Telerik DevCraft Complete Altova XMLSpy Zend Server

Steelray Project Analyzer

Steelray Project Analyzer

 

HIGH QUALITY SCHEDULES LEAD TO A TRUE CRITICAL PATH

PROJECT ANALYZER UNCOVERS SCHEDULE QUALITY ISSUES IN SECONDS

Steelray Project Analyzer is software that takes the pain out of creating, maintaining and delivering quality schedules. With Analyzer, you can evaluate your project schedule for quality and performance in minutes and produce understandable results. Schedules can be analyzed against project management best practices, internally defined best practices and government best practices. Analyzer supports Microsoft Project, Primavera P6 and UN/CEFACT XML.

 

SIMPLE SCORECARD

Our innovative scorecard shows you the results of each check at a glance, using easy to read green, yellow, and red indicators. Our innovative score strip shows you a great deal of information in a compact space. Each scale is completely customizable.

 

REPORT GALLERY

Analyzer comes pre-configured with all of the reports needed to analyze the quality of your schedule. In addition to our innovative scorecards, Analyzer includes schedule validation reports, government standard checks, comparison reports, schedule performance reports, and reports you can customize and build from scratch.

 

DCMA METRICS

The DCMA DECM Metrics and 14 Point assessment are a series of schedule health checks from the Defense Contract Management Agency that help ensure that your schedule has a trustworthy critical path. Steelray Project Analyzer explains the results in an easy to understand format.

 

SCHEDULING ENCYCLOPEDIA

Steelray Project Analyzer includes The Coach, a built-in encylopedia that dives deeper into your results, explaining the findings in simple terms. For some users, The Coach teaches them the fundamentals of schedule quality. For others, it serves as a quick reference.

 

JUMP TO SCHEDULE

When tasks are flagged by Analyzer, simply click on a hyperlink to filter those tasks in the native scheduling application (e.g. Microsoft Project, Primavera P6). Steelray Project Analyzer provides a smooth workflow to fixing schedule quality issues.

 

OFFICE INTEGRATION

Generating reports in Microsoft Office is a breeze with Project Analyzer. Analyzer includes reports that directly create Microsoft Excel, Word, and Powerpoint files. Output from any report can easily be copied into existing or new Office files.

 

FOR MICROSOFT PROJECT AND PRIMAVERA SCHEDULES

Steelray Viewer is the leading tool for project professionals who need to analyze Microsoft Project or Primavera P6 schedules.

 

WHAT PEOPLE SAY ABOUT US

FROM A FEW OF OUR AMAZING CUSTOMERS

 

“I have to tell you how much analyzer has helped me. I have cut my analysis time by 80%. I let Steelray Project Analyzer do it for me. My engineering group loves the Excel output.”

EDWARD DRIELAK

ITT CORPORATION

“Steelray Project Analyzer was developed with the end user in mind. I have been using this tool for a few years now and have been impressed with its ease of use and robust functionality. Project Analyzer has matured with technology by adapting to the latest versions of the products it supports. Additionally, the professional manner in which their customer support staff works with the user is top notch.”

PAUL IBARRA

BAE SYSTEMS

“Analyzer is well thought out like they had been in my arena for the past 10 years. They really knew what issues the end user would have.”

WROY JORDAN

GENERAL DYNAMICS C4S

 

WHY USE STEELRAY PROJECT ANALYZER?

 

Large projects require complex schedules that affect the plans of many people—not just project resources, but finance, management and a host of interdependent departments and entities.

 

It’s critically important that the schedule be as accurate as possible so companies can save effort, reduce budget and enable teams to deliver on time.

 

Unfortunately, complex schedules in complicated scheduling software (like Microsoft Project and Primavera) are prone to errors in the critical path. This makes it difficult to trust the forecast—which undermines confidence in the program.

 

BRINGS CONFIDENCE TO THE SCHEDULE.

As the first and most powerful commercial software application in the “schedule quality” space, Steelray Project Analyzer (Analyzer, for short) continues to set the standard as the best solution to uncover issues in—and improve the accuracy of—the critical path. Here’s why:

  • Analyzer is the only solution to use statistically validated measures.
  • Analyzer offers the most comprehensive repository of best scheduling practices, gathered from a large community of project managers across diverse industries.
  • Analyzer can tackle larger and more complex project schedules than any other solution (which is why some of our best customers are actual rocket scientists).
  • Analyzer’s simple, frictionless interface makes it the easiest solution to use, resulting in shorter time-to-results and greater cost savings.
  • Analyzer makes better schedulers with its built-in encyclopedia of schedule quality.
  • Analyzer uncovers issues far beyond the DCMA 14-point assessment, so you’re more likely to pass an audit and you’ll save the headaches of schedule hold-ups and lost revenue.
  • As the number one schedule quality tool, Analyzer is frequently a skill listed on schedule analyst job descriptions and resumes.
  • Analyzer is a product made and supported by passionate, highly skilled US-based developers, dedicated to great service.

 

WHAT IS STEELRAY PROJECT ANALYZER?

Steelray Project Analyzer is software that takes the pain out of creating, maintaining and delivering quality schedules. With Analyzer, you can evaluate your project schedule for quality and performance in minutes and produce understandable results. Schedules can be analyzed against project management best practices, internally defined best practices and government best practices.

 

Analyzer supports Microsoft Project .mpp files, Project Server, Primavera P6 and UN/CEFACT XML.

 

COMMON MISTAKES CAN SKEW THE CRITICAL PATH

Scheduling software makes it relatively easy to create schedules and calculate a critical path, but it doesn’t do much to prevent common mistakes that result in an incorrect critical path.

 

Based on the thousands of schedules we’ve seen in the past 15 years, we can say with certainty that almost every medium-to-large schedule contains serious mistakes, including:

  • Overuse of hardcoded start and finish dates, instead of letting the scheduling software calculate them.
  • Neglecting to sequence tasks with other tasks they depend on (or that depend on them).
  • Improperly using features of the scheduling tool (EX: adding “lag” to tasks to manipulate start dates).

 

Think about it: the purpose of scheduling software is to produce a good critical path, and almost all medium-to-large schedules contain mistakes that make the critical path incorrect.

 

THE IMPACT OF USING ANALYZER

 

Suppose a company brought you in to consult on a large project they were launching. On your first day, they give you project schedule with a finish date of December 15th that year. You load the schedule into Analyzer, run a scorecard report, and Analyzer flags six crucial problems with the schedule.

 

So you meet with the scheduler and stakeholders, modify the schedule and run it through Analyzer again. Now there are no longer any problems, but the finish date is February 15th, two months later than the original forecast!

 

The impact? You now have valuable, up-front information about the truth of the schedule—and can do something about it—several months before misinformation would have lead to the headaches of time and cost overruns.